Provide clearance
from wall.
2. Prepare the Site
Dual Steam Head Installations
NOTICE: Each steam head must be installed 6" (15.2 cm) from the floor in the shower room.
NOTICE: Provide clearance between the back wall and the elbows. The elbows should not contact the
back wall.
NOTE: The diagram shows two steam heads installed in the same stud pocket. They may also be installed
in separate stud pockets.
NOTE: The edge of the hole should be at least 1" (2.5 cm) away from all wall studs with 10" (25.4 cm)
minimum separating the steam heads.
Drill a 2-1/2" (6.4 cm) diameter hole in the wall at the desired steam head location.
NOTE: Use thread sealant tape on all connections. Do not overtighten the fittings.
Install a 1/2" NPT elbow in each desired location. Leave clearance between the inside wall and the
back of the elbow to allow heat and condensation to dissipate.
Secure the elbow to the framing whenever possible.
NOTE: The steam generator(s) will not operate without water and a connected user interface control.
1045320-2-E
1" (2.5 cm) Min
2-1/2" (6.4 cm)
6" (15.2 cm) from Floor
6
Wall Stud
10"
(25.4 cm) Min
Kohler Co.