Eaton Powerware 9125 Guia De Instalacion página 22

Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

INSTALLATION
6.
7.
8.
9.
The UPS (
two people are required to lift the UPS into the rack.
NOTE The PDM must be installed above the UPS. The EBMs must be installed below the
UPS as shown in Figure 9.
8
EATON Powerware
Tighten assembly wing nuts on both rail assemblies.
Place the UPS on a flat, stable surface with the front of the UPS
facing toward you.
Align the mounting brackets (provided in the rack mounting bracket
kit) with the screw holes on the side of the UPS and secure with
the supplied #6-32 x 3/8" flat-head screws (see Figure 8).
If installing an optional EBM or PDM, repeat Steps 7 and 8 for each
cabinet.
Figure 8. Installing the Mounting Brackets
/
EBM (
37 kg
81.5 lb),
42.5 kg/
Figure 9. Rack-Mount UPS with PDM and EBM
®
9125 (9910-P30) UPS Installation Guide for IBM
C A U T I O N
93
(34
are heavy. A minimum of
lb), and PDM
.5 kg/76 lb)
®
S
Applications
164201636 Rev A
Mounting
Bracket

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p30

Tabla de contenido