Ocultar thumbs Ver también para Powerware 9125:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

EBM Installation

A small amount of arcing may occur when connecting an EBM to the UPS. This is normal and
will not harm personnel. Insert the EBM cable into the UPS battery connector quickly and
firmly.
If you are installing the optional EBM(s), use the following steps:
1.
NOTE Keep the battery connector cover and screws for future use. If the UPS is stored or
used without an EBM, the battery connector cover must be installed as a safety precaution.
2.
NOTE Keep the EBM cable cover and screws for future use. If the EBM is stored or
removed from the UPS, the EBM cable cover must be installed as a safety precaution.
®
EATON Powerware
The UPS has a battery connector cover that must be removed
before installing the EBM(s). Remove the cover from the rear panel
as shown in Figure 22.
Figure 22. Battery Connector Cover
Remove the cover from the EBM cable as shown in Figure 23.
Figure 23. EBM Cable Cover
9125 (9910-P30) UPS Installation Guide for IBM
C A U T I O N
Battery Connector Cover Screws
EBM Cable with Cover
®
S
Applications
164201636 Rev A
INSTALLATION
15

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

9910-p30

Tabla de contenido