INSTALLATION
9.
10. If installing additional cabinets, repeat Step 9 for each cabinet and
14
EATON Powerware
Align each joining bracket with the adjacent corner screw holes and
secure with the supplied screws (see Figure 21).
Joining Bracket
Figure 21. Installing the Joining Brackets (Top View with Pedestals)
continue to the following section, "EBM Installation;" otherwise,
continue to "PDM Installation" on page 17 or "Power Connections
and Startup" on page 20.
®
9125 (9910-P30) UPS Installation Guide for IBM
UPS
EBM
Joining Bracket
®
S
Applications
164201636 Rev A