Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

SET UP PROCEDURES FOR THE TRC 1000
1. Place Control Panel and Cutting Head on a flat table with the back of the Control
Panel facing the side of the Cutting Head. Connect the grey DB-15 Control cable to the
connectors on the back of the Cutter and the back of the Control Panel. Plug the black
Power Cord into the fused power receptacle on the back of the Control Panel. Then plug
the Power Cord into your 110V outlet.
Be sure all connections are tight and secure!
2. Next hook up the Air Regulator to your air supply and set the pressure at 50 PSI.
This will work on most lightweight materials. If the machine is not cutting your material
then increase the pressure in 10# increments until it is making clean cuts.
3. Set the Roll Stand behind the Cutter and line it up with the Guides on the Cutter.
Place one Plastic Disc on the Roll Stand and put on the roll of webbing so that the
webbing rolls off the top of the roll in a counter clockwise motion. Place the other Disc
on the Stand and put the Disc Holder lightly against the Disc and tighten the Thumb
Screw lightly. If the webbing does not turn freely then loosen the Disc Holder a little.
1. Turn the Master Switch to the "ON" position.
2. Adjust the Guides Strips to fit the webbing you are using. Do not make it to tight as
to cause drag on the web.
3. Feed the webbing through the Guides and push it up to the Feed Rollers and then push
the FEED JOG button on the Control Panel. This will take the webbing through the
Feed Rollers. Jog the webbing past the Rollers an inch or so and press the KNIFE JOG
button. You can also put the webbing through the Rollers by pushing down on the Black
Knob and lifting the Rollers and pushing the webbing through by hand.
Note: If your machine is equipped with the optional cutoff switch, you must feed
material under the trip rod before the guides.
FEED JOG Allows you to manually operate the feed rollers.
KNIFE JOG Allows you to manually operate the knife.
RE-SET
Allows you to clear the machine and start a new program.
STOP
Allows you to stop the machine and save all data in the memory.
Also allows you to clear a data entry when programming.
ENTER
Allows you to enter program data.
Model CC7-CS/VS
STARTUP PROCEDURES
KEYBOARD COMMANDS
Cc7setup.wps

Publicidad

Tabla de contenido
loading

Resumen de contenidos para TRC 1000

  • Página 1 SET UP PROCEDURES FOR THE TRC 1000 Model CC7-CS/VS 1. Place Control Panel and Cutting Head on a flat table with the back of the Control Panel facing the side of the Cutting Head. Connect the grey DB-15 Control cable to the connectors on the back of the Cutter and the back of the Control Panel.
  • Página 2 SETTING FEED RATE (for Variable Speed models only) When the control panel is turned on the LCD will read "FEED RATE 5-22". This will determine how fast the webbing will feed through the machine. 5 will be the slowest and 22 will be the fastest. To enter the speed, push the number you desire and press ENTER.
  • Página 3: Procedimiento Para Calibrar El Trc 1000

    Procedimiento para calibrar el TRC 1000 Modelo(s) CC7-CS/VS 1. Coloque el tablero de control y la cabeza de corte on una superficie lisa con la parte trasera del tablero de control hacia el lado de la cabeza de corte. Conecte el cable de control gris DB-15 al conector en la parte de atras de la cortadore y la parte trasera del tablero de control.
  • Página 4: Metiendo Un Programa

    (para modelos con velocidad variable) Cuando el tablero de control esta prendido, el LCD (display de cristal liquido) lee "Feed Rate 1-9". Esto detrmina que tan rapidola hilaza pasara a traves de la maquina. 1 = mas lenta y 9 = mas rapida. Para fijar la velocidad, empuje el numero deseado y se fijara automaticamente.
  • Página 7 Note: When replacing blades, make sure that shoulder of bolt goes through the holes in the blade and not against the outside of blade. Being on the outside of the blade increase the wear rate. Like This Not this Thanks...
  • Página 9: Periodic Maintenance

    Periodic Maintenance Proper operation of your TRC-1000 can be maintained by periodic cleaning, lubrication and adjustment of the Cutting Unit. Linear Shafts/Bushings and Air Cylinder shafts should be kept clean of dust, lent and other foreign substances. These points should also be lubricated periodically with a light weight oil, such as sewing machine oil.
  • Página 10 Spring Tension Adjustment Spring Block Jam Nut Adjusting N Spring 1) Loosen jam nut. 2) Screw bolt in or out with adjusting nut to decrease/increase spring pressure on top roller. (adjust both sides evenly.) 3) Snug jam nut. Note: Excessive roller tension promotes feed roller wear and motor load!
  • Página 11 Purple White Black CP-4 Power Switch Red Black White Purple Blue Line SW Lighted TRC V 1.4 Drive Board White Blue Purple CONNECTOR DB15 CP-17 8amp Fast Acting Fuse FUSE Green Purple Black CP-5 Fused Power CP-9 Receptacle CP-10 TRC Industries...
  • Página 12 TRC Industries Factory Warranty Registration Card Company Name_____________________________ Address___________________________________ City, ST, Zip________________________________ Phone_________________ Email Address_____________________ Fax___________________ Website__________________________ Contact Person____________________________ Date Purchased_____________ Dealer Name_____________________________ P.O. #____________________ Address_________________________________ Model____________________ City, ST, Zip______________________________ Serial # ___________________ Phone_______________ Fax_________________ Salesman_____________________ Mail to: TRC Industries P.O.

Este manual también es adecuado para:

Cc7-csCc7-vs

Tabla de contenido