English
Unpacking and assembling the ECRESO FM 5kW/10kW
This procedure details the different steps for unpacking and mounting the ECRESO FM 5kW or ECRESO
FM 10kW modules in the 29U cabinet.
1. Unpacking and mounting precautions
The packing crate for standard and maritime transport must remain horizontal during transport and
handling. Make sure the Tilt and Shock Watches have not turned red before opening. If they have, refer
to instruction labels on the crate.
The customer is responsible for unpacking the product, and must comply with all applicable safety rules
and regulations, and must follow technical procedures supplied by the seller regardless of its form, so as
to avoid physical harm of material damage.
Weight of the elements packed in the crate:
2000 W FM amplifier (6)
PSU (between 6 and 8)
Dummy load module (2)
Rack with exciter(s), control unit, filter... (1)
Rear panel
Slot filler
Fan frame (with Room to Top configuration only)
Please read additional safety precautions available in the user documentation.
Should you have any question or comment, please contact your WorldCast Systems dealer.
1.1
Operator equipement
At least two operators must be present for unpacking and/or moving the product. These operators must
wear protective clothing, specifically loves and safety shoes to ensure their safety.
1.2
Requirements
There must be enough free space to host the packing crate (230x88x160cm).
To disassemble the crate, use a drill with a Torx T25 bit, set on low speed to avoid breaking or stripping
the screws. .
around 13 kg
around 2.5 kg
around 19 kg
around 264 kg (5kW)
around 277 kg (10kW)
2