Εnglish
• In configuring the ET 200iSP, you must consider the
permissible number of electronic submodules (see the
Distributed I/O ET 200iSP operating instructions,
Chapter 3.6).
Commissioning
• The relevant national regulations must be observed when
commissioning the system.
• When checking the functionality of the equipment, observe
the EN 60 079-17 guidelines. This standard includes the
regulations found in the international standard
IEC 60 079-17.
• The parallel combination of output current circuits is only
permitted for the module types
- 4DO DC17, 4V/27mA SHUT DOWN "H" / "L"
(6ES7132-7RD11-0AB0 / 6ES7132-7GD10-0AB0)
- 4DO DC17, 4V/40mA SHUT DOWN "H" / "L"
(6ES7132-7RD22-0AB0 / 6ES7132-7GD21-0AB0),
and for a maximum of two power circuits which are wired in
parallel. In this case, the separately listed electronic data
on the EC special test certificate apply.
A5E00308221-09
Εnglish