CREE LIGHTING FLX Serie Instrucciones De Instalación página 5

Ocultar thumbs Ver también para FLX Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ELECTRICAL CONNECTIONS- EB
STEP 1:
Using customer supplied 90°C minimum rated wire
connectors, make the following electrical connections:
a. Connect the black luminaire lead to the line or Hot 1.
b. Connect the white luminaire lead
to the neutral or Hot 2.
c. Connect ground wire lead to the supply ground lead.
STEP 2:
Locate the two black/white leads in the junction box and
connect them.
ELECTRICAL CONNECTIONS- GTD
STEP 1:
a. Connect the black luminaire lead to
the normal panel line or Hot 1.
b. Connect the white luminaire lead to the
normal panel neutral or Hot 2.
c. Connect green or green/yellow ground lead to ground.
STEP 2:
a. Connect the red luminaire lead to the
Emergency panel line or Hot 1.
b. Connect the white/red luminaire lead to the
Emergency panel neutral or Hot 2.
© 2021 Cree Lighting, A company of IDEAL INDUSTRIES. All rights reserved. For informational purposes only. Content
is subject to change. See www.creelighting.com/warranty for warranty and specifications. Cree
are registered trademarks a of Cree, Inc. SmartCast
INDUSTRIES.
Importer: IDEAL PRODUCTS DISTRIBUTION DE MEXICO S.
DE R.L. DE C.V.
Address: Paseo de los Adobes, 1079, no. 10, Colonia
Guadalajara Technology Park, C.P. 45010
Zapopan; Jalisco Mexico. TEL: +52 33 3627 7914
5 of 5
®
, is a registered trademark of Cree Lighting, A company of IDEAL
** NOTE: DO NOT mate leads until installation
is complete and AC power is supplied
NORMAL PANEL NEUTRAL
NORMAL PANEL LINE
EMERGENCY PANEL
EMERGENCY PANEL
and the Cree logo
®
LUMINAIRE
GROUND
GREEN/YELLOW
WHITE
NEUTRAL
OR HOT 2
LINE
BLACK
OR HOT 1
**BLACK/WHITE
**BLACK/WHITE
ENABLE
LEADS
LUMINAIRE
GROUND
GREEN/YELLOW
WHITE
OR HOT 2
BLACK
OR HOT 1
WHITE/RED
NEUTRAL
RED
LINE
www.creelighting.com
LPN00437X0007A0_A

Publicidad

Tabla de contenido
loading

Tabla de contenido