step
3
Align the Vertical Mounting
Rail's holes with the cage nuts.
Secure the Vertical Mounting
D
Rails
to the Side Panels using
G
2 M6 cup washers
and 2 M6
E
screws
. Make sure both Vertical
Mounting Rails are aligned.
Note: We recommend installing the
Vertical Mounting Rails with its square
holes facing front. If you choose to install
them with the threaded holes facing front,
use the M6 screws to install the rails, as
stated above, and the included 12-24
screws to mount equipment to the rails.
D
G
4
E
2
4
step
4
Insert slots of Side Panel
into pins of Bottom Panel
Secure the panels using 2 M6
E
screws
.
B/D
1
E
2
15-09-353-933500.indb 4
B
A
.
4
12/1/2015 11:11:03 AM