During Maintenance - Apex Cleco mPro400GCD-P Manual De Usuario

Ocultar thumbs Ver también para Cleco mPro400GCD-P:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1
EN
 Use the tool at the designated grip points.
 Use the recommended reaction devices. For torques,
see tool instruction manual.
 After powering the controller on, wait until the boot
cycle is completed, approximately 60 seconds, before
powering it down again.

During Maintenance

 The controller is generally maintenance-free.
 Consider local regulations for maintenance and servic-
ing for all operating phases of the tightening system.
When Cleaning
 Only clean the exterior of the tool using a dry or slightly
damp cloth.
 Do not immerse the controller or tools in any liquids.
 Do not use a high pressure cleaner.
At The Repair
Repairs to the equipment are not permitted.
 Send the controller to a Authorized
Cleco Production Tools Sales & Service Center.
At Disposal
Components of the tightening system present potential
risks to health and the environment. The tightening system
contains components that can be recycled, as well as com-
ponents that have specific disposal requirements.
 Follow local applicable regulations.
 First separate, then dispose of components.
 Collect auxiliary materials (oils, greases) when drain-
ing and dispose of them properly.
 Separate the components of the packaging and dis-
pose of them according to local regulations.
 Return defective equipment to an approved collection
point or return it to the Sales & Service Center.
Observe local regulations for disposal of
electronics and batteries. (In Germany,
the Electrical and Electronic Equipment
Act (ElektroG) and the Battery Act
(BattG)):
 Used up batteries must be disposed
8
of properly. Return depleted or defec-
tive batteries to an approved collec-
tion facility or to Sales & Service
Center for recycling.
P2300HW | 2019-03
Apex Tool Group

Publicidad

Tabla de contenido
loading

Tabla de contenido