Kohler K-8548 Guia De Instalacion página 10

Ocultar thumbs Ver también para K-8548:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Checkout (cont.)
Open both hot and cold valves and run water through the spout
(if installed) to remove debris. Check for leaks.
Check the handshower for smooth operation.
Confirm proper diverter operation.
Turn the cold and hot handles off and then on. Verify that the
water flow is diverted back to the spout and that the handshower
is off.
Turn the valves to the closed position.
1000588-2-D
10
Kohler Co.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

K-8549K-10342

Tabla de contenido