Warnings; Responsibility - DAB FEKABOX 110 Instrucciones Para La Instalación Y El Mantenimiento

Ocultar thumbs Ver también para FEKABOX 110:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 40
CONTENTS
1.
WARNINGS ..................................................................................................................................................................................19
2.
Responsibility .............................................................................................................................................................................19
3.
MANAGEMENT ............................................................................................................................................................................20
3.1
Storage ................................................................................................................................................................................20
3.2
Transport ............................................................................................................................................................................20
4.
EXAMPLE OF INSTALLATION ..................................................................................................................................................20
4.1
Dimensions and weights ...................................................................................................................................................20
5.
TANK INSTALLATION .................................................................................................................................................................21
5.1
Placing the tank inside the building .................................................................................................................................21
5.2
Placing the tank outside the building ..............................................................................................................................22
5.3
Making holes for the collection, delivery and ventilation pipes ....................................................................................22
5.4
Gluing the collection and ventilation pipes .....................................................................................................................22
5.5
Connecting the delivery pipe to the sewer network .......................................................................................................23
5.6
Connecting the ventilation pipe ........................................................................................................................................23
5.7
Closing the cover ...............................................................................................................................................................23
5.8
Provision for emergency drainage ...................................................................................................................................23
5.9
Non-return valve.................................................................................................................................................................23
5.10
Interception gate valve ......................................................................................................................................................23
6.
PUMP INSTALLATION (fig.8) .....................................................................................................................................................24
7.
ELECTRICAL CONNECTIONS ....................................................................................................................................................24
8.
FIRST START-UP ........................................................................................................................................................................24
8.1
Operating flow rate ............................................................................................................................................................24
8.2
Operation ............................................................................................................................................................................24
9.
MAINTENANCE ...........................................................................................................................................................................25
10. TROUBLESHOOTING .................................................................................................................................................................25
11. DISPOSAL ...................................................................................................................................................................................25
1.

WARNINGS

1.1
Before installation, carefully read this documentation and that supplied with the pump manual and the
control panel.
It is indispensable to have the electric and hydraulic connections made by skilled personnel, in possession of the
technical qualifications indicated by the safety standards concerning the design, installation and maintenance of
technical plants, in force in the country where the product is to be installed.
Failure to comply with the safety regulations not only causes risk to personal safety and damage to the equipment,
but invalidates every right to assistance under guarantee.
1.2
The term skilled personnel means persons whose training, experience and instruction, as well as their knowledge
of the respective standards and requirements for accident prevention and working conditions, have been approved
by the person in charge of plant safety, authorizing them to perform all the necessary activities, during which they
are able to recognize and avoid all dangers. (Definition for technical personnel IEC 364).
The appliance is not intendend for use by persons (including children) with reduced physical, sensory or mental
capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction
concerning use of the appliance by a person responsable for their safety. Children should be supervised to ensure
that they do not play with the appliance
1.3
Check that the system has suffered no damage during transport or storage. In particular, ensure that the external
casing is perfectly entire and in excellent condition; check the efficiency of all the tank components; replace any
parts that are not perfectly efficient.
1.4
Do not use inflammable or highly corrosive liquids or anything other than indicated by standard EN 12050-2.
1.5
If the installation is indoors, adequate drainage must be ensured in the event of leakage from the tank
1.6
For correct installation, follow the instructions in chapters 3-4-5 below. If you want to install the Fekabox lifting tanks
outside the home, attention must be paid because the maximum admissible load on the cover is 100 kg (see
also the symbols on the cover).
2.

RESPONSIBILITY

The Manufacturer does not vouch for correct operation of the machine or answer for any damage that it may cause if it has been
tampered with, modified and/or run outside the recommended work range or in contrast with other indications given in this manual.
ENGLISH
19

Publicidad

Tabla de contenido
loading

Tabla de contenido