3
Quick Start
3.1
Setup
Note: The instrument will not heat, cool, or control until the "SET PT." parameter is
"Enabled".
Place the calibrator on a flat surface with at least 6 inches of free space around the instrument.
Overhead clearance is required. DO NOT place under a cabinet or structure.
Plug the instrument power cord into a mains outlet of the proper voltage, frequency, and current
capability (see Section 2.1 Specifications on page 13 for power details). Observe that the nomi-
nal voltage corresponds to that indicated on the front of the calibrator.
Carefully place the insert into the well. Inserts should be of the smallest hole diameter possible
still allowing the probe to slide in and out easily. Various insert sizes are available. Contact an
Authorized Service Center for assistance (see Section 1.6 Authorized Service Centers on page
9). The well must be clear of any foreign objects, dirt and grit before an insert is installed. The
insert is installed with the two small tong holes positioned upward.
Turn on the power to the calibrator by toggling the switch on the power entry module. After a
brief self-test, the controller should begin normal operation. The main screen appears within
30 seconds. If the instrument fails to operate, please check the power connection. The display
shows the well temperature, and waits for user input before further operation.
Press "SET PT." and use the arrow keys to set the desired set-point temperature. Press "EN-
TER" to save the desired set-point and enable the instrument. After five (5) seconds, the instru-
ment should start to operate normally and heat or cool to the designated set-point.
Quick Start
Setup
17