Descargar Imprimir esta página

Project Source FW6BC002CP Manual De Instrucciones página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY INSTRUCTIONS
7.
Insert hot handle (A) and cold handle (J) through
the appropriate faucet holes.
8.
From underneath sink, replace rubber washer
(B) and metal washer (C) onto shanks of hot
handle (A) and cold handle (J). Secure with
guide washer (D).
9.
Remove caps from quick connect tubes.
7
A
8
A
1
B
C
D
9
6
2
J
1
3
J

Publicidad

loading