Components; Pumps/Motor; Control System; Flow Switch - Ecolab Hybrid Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

30°
30°
Loctite 577 is used at the factory to seal the thread,
but packing yarn/packing tape can also be used.

9.2. Components

9.2.1.

Pumps/motor

Pumps/motor are maintenance free.
9.2.2.

Control system

Maintenance free
If defective: Call a service technician
9.2.3.

Flow switch

Maintenance-free.
If defective, replace the flow switch.
1. Press "0" on the control pane to stop the system.
2. Remove the cover
3. Turn "rinse/foam" handle on a satellite to foam
position.
4. Activate the spray handle on the outlet hose of
the satellite so water runs out.
5. Check that the flow switch is turned the correct
way (the wire must follow direction).
6. Turn the brass screw at the bottom of the hole
until a green diode lights up.
7. Close the spray handle again and check that the
red diode lights up.
8. Mount the cover.
18

9.3. Preventive maintenance

Depending on usage, maintenance should be un-
dertaken by an authorised service engineer at least
once a year in order to prevent defects and failure of
operation. Authorised engineers are persons who due
to their skills and experience have sufficient knowl-
edge of the Booster Systems and are confident with
the state work safety regulations, accident prevent-
110002491
ing regulations, lines and generally acknowledged
technical regulations such as DIN-norms and VDE-
provisions. For your safety, this unit has been manu-
factured according to all relevant regulations valid in
the EU and therefore it has been supplied with the
CE-marking. For further information, please refer to
the service department.

9.4. Internal cleaning of the unit

We recommend opening and cleaning the unit inside
min. once a month.

Publicidad

Tabla de contenido
loading

Tabla de contenido