FLAT
Place the evaporator front on previous studs
9
with (1) M6 wide ring washer and (1) M6 nut on
each stud. Tighten nuts until air ducts systems
touch upper foam gasket (see diagram
bellow).
Important: Air ducts must touch foam
gasket to avoid air leaks.
9
EPDM
Gasket
Cabin roof
Upholstey
Tighten nut mentioned under point 8a until it
10
touches upper surface of front.
10
EPDM
Gasket
Cabin roof
Upholstey
Unit base
(A)
Nut M6
Stud M6
Unit base
Nut M6 (8a)
Nut M6
Stud M6
Air ducts
Air ducts
25
®
Foam Gasket
Front with louvers
Foam Gasket
front with louvers
EN
ES
9