BOCCHI 2019 0001 Serie Instrucciones De Instalación página 4

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation continued:
Connect the pullout hose into the quick connection.
Attach the water supply lines to the hot and cold service stops and turn on the
water. The hot supply line can be identified by red markings on the supply line,
and the cold supply line by blue markings; some hoses may have both red and
blue markings and are suitable for use with either line.
Remove the spray-head, by gently pulling it down and twisting clockwise to
unscrew it from its connection. Hold the hose and be sure to aim the water
stream into the bottom of the drain to reduce splashing. Run the water for 1-2
minutes at a mixed temperature to remove any dirt or debris that may be in
the line and could damage the spray-head.
Reattach the spray-head and check for leaks.
User Control Guide:
4
Install the weight to the pullout hose above the loop on the pullout side. Install by
unscrewing the screws holding the barrel of the weight closed. Open the weight and
enclose the pullout hose into the fitted opening inside the weight. Finish by securely
closing the weight and replacing the screws to hold it closed, enclosing the pullout
hose within.
www.BOCCHIUSA.com

Publicidad

Tabla de contenido
loading

Tabla de contenido