H-4415, H-4416, H-8140
ALUMINUM BLEACHER MOUNTING
HARDWARE FOR GRASS
TOOLS NEEDED
Electric or
Gas Auger
or
Post Hole Digger
Anchor
x 2 for 3-Row
x 2 for 4-Row
x 4 for 5-Row
WARNING! Before ground anchor installation,
determine that the anchor locations around
bleacher will not be close to any underground
electrical cables, water lines or sewer piping.
Failure to determine the location of electrical
cables may result in serious personal injury.
1.
Before assembling the bleachers, attach bleacher
frame to the 2 x 6" treated ground sill (not included)
with 3/8" x 1½" lag screws (not included). (See Figure 1)
Figure 1
Bleacher
Frame
PAGE 1 OF 9
Shovel
INSTRUCTIONS
3/8" x 1½"
Lag Screw
2 x 6" Treated
Ground Sill
1-800-295-5510
uline.com
15/16" (24mm)
Adjustable
or
Open Wrench
Wrench
PARTS
Split Lag Bolt
x 2 for 3-Row
x 2 for 4-Row
x 4 for 5-Row
2. Anchor will be on each end of the bleacher.
Bleacher frame needs to rest on a 2 x 6" treated
ground sill (not included).
NOTE: Anchors require using either an electric
auger or post hole digger and backfilling
the holes.
3. Thread the auger end of the anchor into the ground,
so the tip is 1" above the ground. (See Figure 2)
Figure 2
Para Español, vea páginas 4-6.
Pour le français, consulter les pages 7-9.
Socket Wrench with 15/16"
or
(24mm) Deep Well Socket
Strap
x 2 for 3-Row
x 2 for 4-Row
x 4 for 5-Row
Nut
x 2 for 3-Row
x 2 for 4-Row
x 4 for 5-Row
Anchor
1"
0721 IH-4415