GB
6.3 Start (with environment thermostat)
-The unit is pre-set for connection to an environment thermostat (not supplied as standard).
-Connection should be made using the plug on the control panel.
-Having set the environment thermostat, place the switch to AUT. To halt the generator,
operate either the main switch or the environment thermostat.
In both cases, the generator undergoes a correct cooling cycle.
When the machine is in normal duty condition the reset button will flash. In case of bad
working, the reset button will stay alight for about 10 sec. Please detect and solve the problem
causing the failure and reset the machine by pressing the button.(only for SATRONIC DKO
970)
7.
CLEANING THE TURBO
- The turbo disc is an integral part of the tapered inlet.
- To clean the disc, it must be removed from the support.
Proceed as follows:
- Remove the fuel oil pipe.
- Slide out the photosensitive cell and the HT leads from the electrodes.
- Unscrew the four screws securing the head to the boiler (the head is removed complete).
- Slacken the two screws: the entire internal section of the head slides out; only the
cylindrical body and the tapered inlet remain accessible for cleaning.
N.B. - When refitting the combustion head after cleaning operations, do not move the nozzle
holder. Make sure, as required, that the nozzle is flush with the inside of the turbo. The
position of the electrodes must be respected, as well as the angle of the air adjustment fins.
5