Packaging Content - effegibi MASTER SQUARE Manual De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 28
1.
DIS ASSEMBLING
Open the package being careful not to damage the content and pay attention when you handle the door and the wall
with system and heater.
ATTENTION: After having taken out the package, control the integrity and completeness of the items; in case of damage
due to transport it is necessary that you inform the forwarder in terms of law for the claim for damages to the insurance.
2.

PACKAGING CONTENT

The package contains:
Quantity
Identification
N° 4
A, D,E,F
N° 2
B, C
N° 4
G, H,I,L,
N° 2
M,N,
N° 1
N° 4
N° 3
N° 1
N° 1
N° 1
N° 1
N° 1
N° 1
N° 1
N° 2
N° 1
N° 1
N° 1
N° 1
3.
ASSEMBLING
NECESSARY TOOLS:
-
Screwdriver;
-
Ladder;
-
Screwdriver set;
-
Spiral ratchet cross screwdriver;
-
Hammer;
-
Scissors;
The sauna was manufactured in compliance with the safety requirements established by the following directives:
CEE 73/23 plus 96/68 CEE (BT) general electric safety;
CEE 89/336 plus 93/68 CEE (EMC) electromagnetic compatibility;
Established by the CEI 64-8 (IEC 60364) directive.
The conformity is guaranteed by the enforcement of the following European norms:
EN 60335-1, EN60335-2-53, EN 55014-1, EN55014-2.
Some information or pictures in this manual may show details and spare parts which may be slightly different from the ones of
Your sauna: however the primary information are not modified. Following our constant search for improvements, the sauna may
show some changes which are not included in this manual.
The company refuses all responsibility for damages caused by an inappropriate use of the sauna.
The company reserves the right to institute legal proceedings against those who will make any changes to its saunas without
previous written authorisation.
PROCEDURE:
The installation must be done by qualified people basing on the information given in this manual and in accordance to
CEI 64-8 (IEC 364-1). You must install upstream the electrical power system, a thermal- magnetic circuit breaker earth
leakage with contacts opening distance O 3mm. Make sure that the floor of the area where you want to place the sauna
is not made of plastic, moquette, linoleum ect. As with the heating bad smells could develop. Verify that the floor where
you want to place the sauna is regular and flat We suggest you to start assembling the back side. If this parts are near
the walls of the room, it will be better, at leas in the beginning, to keep the sauna at some distance from the final position
and them push it to the desired position.Make sure, before screwing one vertical wall to the other, that there are no
differences in height where are ceiling will be placed afterwards; If you have gaps you could have heat loss.
DESCRIPTION
SIDE WALLS
BACK WALLS
FRONT ELEMENTS
CEILINGS
SIDE WITH SYSTEM
FLOORS
BENCHES
DOOR
GLASS WALL
HEATER PROTECTIVE GRID
ROCKS
SAND GLASS
BUCKET
LADLE
HEAD / BACK REST
SCREWS
ASSEMBLING MANUAL
USE MANUAL
WARRANTY
Pag.3
di 31

Publicidad

Tabla de contenido
loading

Tabla de contenido