Preparatory Steps - Elnur Gabarron ECOMBI SOLAR Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2.2. Commissioning
An easy installation wizard is programmed in Ecombi Solar electronic control. Follow the start wizard instructions when turning
your Ecombi Solar on for the first time or after resetting it to the factory settings.
START WIZARD - INITIAL SETTINGS.
The Ecombi Solar electronic control will guide you through the commissioning of the unit. The steps to follow are:
a. Select language. Confirm the language in the storage heater electronic control.
b. Date & Time. Check and confirm that the default date & time in the unit is correct. If not, please change it.
c. Charging periods. 2 different charging periods can be set in Ecombi Solar. Set Charging Periods 1 & 2 according to your
electricity low tariff hours.
By default, Ecombi Solar is set to an 8 hours charging period, from 00:00 to 08:00 hours. If this charging time matches your
electricity low tariff hours, you do not need to make any changes in the unit configuration. Otherwise, you can change charging
Periods 1 and 2 to match your electricity tariff.
If your electricity tariff is 14 hours off-peak, you must modify the charging configuration in the advance settings menu and select
14 hours nominal charging period.
d. Temperature setting. This is the last step of the start wizard. Select and confirm the room set temperature of your choice.
With the help of the start wizard, you will set you Ecombi Solar storage heater for an autonomous operation. It will charge and
store the heat during the charging hours set in c.Charging Periods and it will adjust the charge level and consumption according to
the set temperature of your choice.
An incorrect time, charging periods or set temperatures configuration, might result in a high cost of the electricity bill.
2.3. Utilization of photovoltaic surplus

PREPARATORY STEPS

Before using the PV surplus utilization function of your Ecombi Solar storage heaters, please perform the following steps:
a. Installation and setting of the control hub and power meters included in the Solar Box. Please follow the instructions included
within.
b. Download from your market app the Elnur Gabarron Wifi Control app, available for IOS & Android.
c. Create your user account in the app if you still do not have one.
d. Register the control hub included in the Solar Box using your user account. Then link also the power meters included in the
Solar Box if you still have not.
e. Link the Ecombi Solar storage heaters to the control hub using the app. (See point 4. Remote Operation using the G-Control
Hub for more detail).
i
To set and activate the PV surplus utilization function it is necessary to install the Solar Box device (1 Solar box per installation).
i
The PV surplus utilization function is only valid for installations for self-consumption connected to the grid and discharging energy
to the network.
16

Publicidad

Tabla de contenido
loading

Tabla de contenido