to overheat which can cause damage to the unit that is NOT covered by the warranty.
5. If a voltage tester is available, the user can verify the correct voltage is supplied BEFORE
connecting the ballasts to the receptacles.
6. Turn on the circuit breaker or connect the main power cable connection. The unit will now be
"powered."
7. Using the volt meter, carefully touch one tester probe to each of the main power connection
points. The volt meter should read approximately 240 volts (if connected to a 240 circuit) or
approximately 120 volts (if connected to a 120 volt circuit).
8. Once the correct voltage has been verified, carefully reinstall the cover on the unit using the 4
screws.
TESTING THE 120 VOLT TRIGGER CABLE
1. The main relay(s) inside the unit will be turned ON when the trigger cable is connected and
activated. The trigger cable must be connected to a timer or lighting controller that will provide
120 volts to the main relays.
2. When the trigger cable is connected and plugged into the timer/controller, the relays will "close"
and the small indicator light on the bottom of the unit will be illuminated.
3. When the trigger cable is disconnected, the relay will "open" and the indicator light will turn off.
Once the trigger has been tested for proper operation, unplug the trigger cable.
CONNECTING THE BALLAST
1. The final step in the installation is to connect the ballast power cables to the receptacles on the
sides of the lighting controller. (Ensure the trigger cable is not powered up while plugging in or
disconnecting the ballasts.)
2. Once the ballasts are connected, the unit is now ready for operation. Connect and power up the
trigger cable. The unit should activate and the lights should now be turned on.
NOTICE: The manufacturer, distributors and their retailers cannot be held responsible for any dam-
age or injuries, consequential or otherwise arising from the use of this product. The user of this
product assumes all responsibility for the installation and proper use of this product.
4-LIGHT CONTROLLER (APCL4DX)
MAIN POWER
CONNECTIONS
GROUNDING
TERMINAL
TRIGGER CABLE
INSTRUCTIONS
RELAY "ON" INDICATOR LIGHT
8-LIGHT CONTROLLER (APCL8DX)
MAIN POWER
CONNECTIONS
GROUNDING
TERMINAL
TRIGGER CABLE
RELAY "ON" INDICATOR LIGHT
3