1.
Mark middle and bottom pole sections indicated distance from ends with tape.
2.
Ensure ground is level with playing
surface, then dig pole hole*.
WARNING!
CONTACT UTILITIES
BEFORE DIGGING.
P/N 205331C
10/01
TOP
1
GROUND SURFACE
• Surface du sol
• Superficie del piso
• Superficie al suolo
• Solo
• Bodenfläche
• Grondoppervlak
• Grundflade
• Underlag
• Markyta
*This hole size represents the minimum requirement for
ideal conditions. The location (hill/incline) of the pole, soil
conditions (sand/clay) and other factors could require a
8" (20.3 cm)
14" (35.6 cm)
MIDDLE
5" (12.7 cm)
BOTTOM
18" (42.7 cm)
24" (61 cm)
WARNING!
larger hole size and concrete footing.
Pour concrete into hole and insert bottom pole
3.
section to the 14" (35.6 cm) mark. Center pole
section in hole, and level in all directions. Check
leveling several times while concrete is curing.
NOTE: Minimum distance from center of pole to
edge of hole 8" (20.3 cm).
Tamp down concrete to release air pockets, then
4.
build drainage hill. NOTE: Bottom of pole to top
of hole/playing surface, not including drainage
hill 14" (35.6 cm).
Fill pole half way with concrete.
5.
NOTE: Approximately 500 lb (227 kg) of
concrete is required for hole and bottom pole
section.
16
1
14" (35.6 cm)
1
NOTE: Maximum distance
from edge of hole to edge of
playing surface 6" (15.2cm).
6" (15.2 cm)
PLAYING SURFACE
• Surface de jeu
• Superficie de juego
• Superficie di giuoco
• Área de Jogo
• Spielfläche
• Speeloppervlak
• Spilleflade
• Spillebane
• Spelplan

Publicidad

loading