To Remove The Transportation Stay; Unit Installation; Preparing The Installation Site; Installation Site Requirements Of The Outdoor Unit - Daikin Altherma 3R Manual Del Usuario

Ocultar thumbs Ver también para Altherma 3R:
Tabla de contenido

Publicidad

f
a
Sling to carry the unit
b
Installation manual – Outdoor unit
c
Multilingual fluorinated greenhouse gases label
d
Fluorinated greenhouse gases label
e
Energy labels
f
Discharge grille
g
Screws for discharge grille
3.1.2

To remove the transportation stay

NOTICE
If the unit is operated with the transportation stay attached,
abnormal vibration or noise may be generated.
The transportation stay protects the unit during transport. During
installation it must be removed.
Prerequisite: Open the service cover. See
unit" [ 4  11].
outdoor
a
Nut
b
Transportation stay
c
Spacer
1 Remove the nut (a) of the compressor mounting bolt.
2 Remove and discard the transportation stay (b).
3 Remove and discard the spacer (c).
4 Reinstall the nut (a) of the compressor mounting bolt and torque
to 10.1 N•m.
ERLA11~16DAV3+W1
Daikin Altherma 3 R
4P643598-1 – 2021.09
a
b
c
ENERG
ENERG
Y
IJA
Y
IJA
IE
IA
IE
IA
d
e
g
"4.3.1  To open the
4
(10.1 N·m)
1
a
3
c
2
b
4

Unit installation

4.1

Preparing the installation site

4.1.1
Installation site requirements of the
outdoor unit
Mind the spacing guidelines. See figure 1 on the inside of the front
cover.
Translation of text on figure 1:
English
Discharge-side obstacle
General
No top-side obstacle
Suction + discharge-side
obstacle
Suction-side obstacle
Top-side obstacle
Wall height unrestricted
Wall on discharge side
Wall on suction side
The outdoor unit is designed for outdoor installation only, and for the
following ambient temperatures:
Cooling mode
10~43°C
Heating mode
–25~35°C
DHW production
–25~35°C
4.2

Mounting the outdoor unit

4.2.1

To provide the installation structure

Use 4 sets of M12 anchor bolts, nuts and washers (field supply).
Provide at least 150  mm of free space below the unit. Additionally,
make sure the unit is positioned at least 100  mm above the
maximum expected level of snow.
(mm)
a
Make sure not to cover the drain holes. See
mm)" [ 4  10].
(dimensions in
4 Unit installation
Translation
Discharge-side obstacle
General
No top-side obstacle
Suction + discharge-side
obstacle
Suction-side obstacle
Top-side obstacle
Wall height unrestricted
Wall on discharge side
Wall on suction side
4× M12
a
"Drain holes
Installation manual
9

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Erla11dav3Erla14dav3Erla16dav3Erla11daw1Erla14daw1Erla16daw1

Tabla de contenido