KA 65
GB
Purging process is carried out
2
190 °C
Adhesive nozzles are open,
pressure has built in the adhe-
sive cartridges. Display of the
current status.
Cooling mode
180 °C
The machine reduces the tem-
perature in cooling mode and
then switches off. Cooling mode
is activated when:
–on/off switch [1-8] is pressed
< 1 s
–no controls are actuated for
more than 15 minutes
The machine is switched on
again by pressing the start but-
ton [1-1] or the on/off switch
[1-8].
Fault symbol
0
Troubleshooting (chapter 12).
**
Automatic calculation of currently detected edge
height
7.6
Dust extraction
CAUTION
Vapours emitted during the glueing process!
Ensure there is good ventilation.
Use an extractor.
Always observe national regulations.
An extractor hose with a diameter of 27 mm can be
attached to the extractor connector [1-6].
8
Working with the machine
WARNING
High temperatures on the heating unit and adhe-
sive nozzle!
Risk of burns when touched
Wear suitable protective gloves.
Always hold the machine by the insulated han-
dles [1-3], [1-16]!
18
WARNING
Moving workpiece!
Risk of injury from sliding workpiece
Always secure the workpiece in such a manner
that it cannot move.
8.1
Glueing the edge band
Cut the edge band down to size, leaving an al-
lowance of approximately 10 cm.
Switch on the machine [1-8].
Select the temperature setting [1-7].
Display [1-20] lights up red = actual and set-
point temperature are displayed. Machine is not
yet ready for operation.
Display [1-20] lights up green = operating tem-
perature reached. Setpoint temperature is dis-
played.
Machine is now ready for operation.
Adjust the relevant settings (chapter 7).
Press the start button [1-1] once.
Edge inlet mechanism starts up.
Guide the edge band into the edge inlet within 20
seconds [1-11].
The time remaining is shown on the display
.
[1-20]
The edge band is drawn in automatically up to
the light barrier [3-4] .
Inlet stops.
Position the machine on the workpiece [4-1]
approx. 2 cm away from the contact roller [4-3]
with reference to the start marking [4-2] [4].
The start marking [4-2] and edge of the work-
piece must be flush with one another.
Press the start button [1-1] again.
Inlet starts.
Wait until the edge band with adhesive is visible.
Push the machine down onto the workpiece and
guide lengthways from right to left [5]. Exert
pressure on the support base and against the
workpiece. Applying pressure in the feed direc-
tion is not necessary.
The edge feed mechanism moves the machine
forwards automatically.
Once the edge band has passed through the
feed completely, the mechanism stops automat-
ically after a short delay.