Kohler Fleur K–2119 Manual Del Usuario página 3

Ocultar thumbs Ver también para Fleur K–2119:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Mark the centerline on the floor.
Refer to the roughing-in information, and position the pedestal on
the floor centerline location at the required distance from the
finished wall.
Carefully lift the lavatory into place on the pedestal, and slowly
move the pedestal as required to ensure proper fit in the desired
location.
NOTE: The lavatory must be supported by the pedestal.
Level the lavatory.
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall. Now mark the floor through the hole
in the pedestal bottom.
Kohler Co.
3
1016190-2-A

Publicidad

Tabla de contenido
loading

Tabla de contenido