Toto EcoPower Manual De Instrucciones página 8

Ocultar thumbs Ver también para EcoPower:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

INSTALLATION PROCEDURE — LARGE COVER
7. Pass the flush pipe and the vacuum
breaker through the guide hole (Step
3) and mount them on the bowl.
8. If required, cut the vacuum breaker
tube to the proper length.
9. Make sure that the o-ring fits in the
groove at the end of the Flush Valve
tailpiece.
NOTE: Exercise care to avoid damaging the
o-ring when inserting the tailpiece
into the control stop. If lubrication is
needed, wet the o-ring with water.
10. Connect the Flush Valve with the control
stop and vacuum breaker tube.
TET2LA(X)32, TET2GA32, TET2UA(X)32
TEU2LA(X)12, TEU2UA(X)12
7" (178mm) Min space
requirement in wall
Wall surface
6~6-1/2"
(152~165mm)
1-1/2" (38mm)
or 3/4" (19mm)
Top spud
5"
(127mm)
2-1/4"~2-3/4"
(57~70mm)
3-3/4"~4-7/8"
Bowl or Urinal
(95~124mm)
TET2LA(X)33, TET2UA(X)33,
TET2GA33
7" (178mm) Min space
requirement in wall
Wall surface
Back spud
Floor mount
3-3/4"~4-7/8"
Bowl
(95~124mm)
8
TET2LA(X)31, TET2UA(X)31
TET2GA31
7" (178mm) Min space
requirement in wall
Wall surface
Back spud
Wall mount
3"
(76mm)
Bowl
TEU2LA(X)11, TEU2LA(X)21
TEU2UA(X)11
7" (178mm) Min space
requirement in wall
Wall surface
1-1/4" (32mm)
or 3/4" (19mm)
1-1/2"
(38mm)
Urinal
1-1/2"
(38mm)
3-3/4"~4-7/8"
(95~124mm)
3-3/4"~4-7/8"
(95~124mm)

Publicidad

Tabla de contenido
loading

Tabla de contenido