Installation; Preparing For Installation - Glacier bay 67536-0508D2 Guía De Uso Y Mantenimiento

Mezcladora para cocina, con rociador retráctil, un solo maneral, luz led y activación sin tocar
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

1

Preparing for installation

CAUTION: Always shut off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply. Remove the old
faucet. Clean the mounting surface.
Before installation, remove the quick connector (K)
from the free end of the hose by unscrewing it in
a counterclockwise direction.
2
Installing the faucet assembly
2a
NOTE: This step is for no escutcheon installation (optional).
Install the faucet body (A)-including supply
hoses and sensor cable (1)-through the hole
in the sink.
A
1
2b
NOTE:
This step is for escutcheon installation (optional).
Silicone sealant is required under the gasket (G).
Place the escutcheon (F) and gasket (G) on the
holes in the sink.
Install the faucet body (A)-including supply
hoses and sensor cable (1)-through the hole
in the escutcheon (F).
4
K
F
G
A
1
F

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Hd67536-0501Hd67536-0527h21001407752304236320304236333

Tabla de contenido