2.6 Stand
Stand folded shut. The
instrument can be hung
up on a strap
3. Commissioning
3.1 Scope of delivery
SD 325 Con (Set 1)
• Basic instrument
• Conductivity electrode
LC 12 (K ≈ 0.55)
• Conductivity solution
• 2 x AAA batteries
• Protective armour
• Operating instructions
3.2 Operating and maintenance instructions
Protect the instrument and electrodes at all times from conditions that could damage the
mechanical and electronic components. Pay particular attention to the following points:
• The temperature and ambient humidity during operation and storage must be within
the limits specified in the technical data
• The instrument must be kept away from the following influences at all times:
- Extreme dust, moisture and wetness
- Intense light and heat
- Irritant fumes or vapours containing high concentrations of solvents
• The batteries must be removed when storing the instrument at ambient temperatures
above 50°C, or before long periods without use
• When connecting the USB interface cable, ensure that only permitted components
are connected
Operation with the USB 300 interface cable is recommended. In this case, the
instrument will draw power from the USB interface of the connected PC or USB
power adapter.
44
Pull
Pull to expand
SD 325 Con (Set 2)
• Basic instrument
• Conductivity electrode
LC 16 (K ≈ 0.42)
• Conductivity solution
• 2 x AAA batteries
• Protective armour
• Operating instructions
1 x pull:
Set up the instru-
ment on a table
SD 325 Con (Set 3)
• Basic instrument
• Ultrapure water conducti-
vity electrode LC 10
(K ≈ 0.1)
• 2 x AAA batteries
• Protective armour
• Operating instructions
• Flow cell
SD_325_Con_1 06/2020
2 x pull:
Hang the
instrument on
a screw