GiBiDi TOUCHE Serie Manual De Instrucciones página 23

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 38
TOUCHE
Annual cycles
(with 8 operating hours a day)
Heavy use
Total weight incl. case
Cylindrical column
Outside diameter
Thickness
Treatment
Reflective adhesive strip
TOUCHE HYDRAULIC BOLLARD COMPONENTS (3a - 3b)
1- Manual release device cap
2- UNI 5933 M10x25 screws
3- Covering flange
4- Bollard cap with warning LEDs
5- Warning LEDs
6- Reflective adhesive strip
7- Retractable cylindrical steel column
8- Metal case
9- Electric cables
INSTALLING THE METALLIC MASS DETECTOR
The magnetic coil is an essential accessory to ensure that no transiting or stationary vehicle can come into contact
with the bollard when it is rising. It must be positioned in the vicinity of the bollard where the vehicles enter and exit. It
is important to check that in the immediate vicinity of the electronic control units there are no sources of disturbance
that may condition the metal detector coils. It is recommended to install the magnetic coil according to a rectangular
perimeter with the longest side perpendicular to the movement direction (4). If this is not possible, other
configurations may be used, however always respecting the coil characteristics. Always refer to the instruction
manual provided with the metal detector (GIBIDI item code: 48134 – 48134/220V)
LAYING THE FOUNDATION FOR THE BOLLARD
1- Draw the layout for bollard installation and check if there are any sub-services in the area to be excavated.
2- Excavate according to the dimensions of the metal containment case (5).
3- Check water absorption into the ground (wet it with about 40 litres of water and check that the water is drained in
less than 30 minutes); otherwise provide for rainwater drainage by laying a 60mm pipe with non-return valve
connected to the sewerage or, alternatively, a well (equipped with a drainage system, for example, an electric
pump) with a depth greater than the cement pipe that collects and drains the rainwater.
4- Pour in some gravel - as monogranular as possible (grain size about 8-20mm Ø ) C(6a - 6b), to form a layer
approximately 30cm thick and compact and level it to obtain a suitable laying surface.
5- To improve rainwater drainage in the excavation and in the area of the metal case run a PVC tube segment of
125 mm in diameter and about 30cm long through the gravel. F(6a - 6b).
Ø 127 mm
10 mm
black cataphoresis + RAL 9005
black polyester powder paint
Standard H 50 mm
10- 25 μF capacitor
11- UNI 5933 M12x60 retaining screws
12- Manual release device
13- 3 guide rods
14- Piston rod
15- Hydraulic control unit
16- Hydraulic piston
17- UNI 5933M12x40 adjustment screws
18- UNI 5933M10x50 retaining screws
N° 213100
YES
272 Kg
Ø 273 mm
10 mm
black cataphoresis + RAL 9005
black polyester powder paint
Standard H 50 mm
23
UK

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Touch 120Touch 275

Tabla de contenido