Cable Management
1
Route power and monitor cables through the
flexible Cable Clips (A) on the Upper
2
Slide the Cover (B) off of the Straight Link.
3
Route cables into the Straight Link and replace
the Cover, sliding until it clicks into place.
4
Route cables through Cable Routing Hook (C).
CAUTION: Don't insert extension cords. Don't insert
any cord connecting one workstation to another.
②
Adding A Second Row Of Monitors
1
Remove Cap from the top of the first Post.
2
Install the Coupling Screw (A) into the top of
the Post. Leave half of the Screw sticking out.
3
Screw second Post onto the Coupling Scew.
Posts must be tightly seated against each other.
4
Push Cap on top of second Post.
M/Flex Clamp Adjustments
Your M/Flex arrives ready for use, however it may
become necessary to adjust the clamp.
1
Remove monitors and links from the Bracket.
2
Open the Lever (A) all the way.
3
Turn the Adjustment Screw (B) clockwise ¼ of a
turn using the 3 mm hex key (C).
4
Test your adjustments by closing the Lever.
CAUTION: If the lever is difficult to close, or will not close fully,
it is over-tightened. Turn the adjustment screw counter-clockwise
slightly. Forcing it closed will damage the M/Flex.
8
Link.
③
B B
①
④
⑤
A
⑥
A
C
A
B
C