Manuale del d'uso ed installazione – M300-M350
(GB) INSTALLATION
The table must be set properly, adjusting if necessary the height of the feet (M). It is not necessary to fix the
machine to the floor.
ELECTRICAL CONNECTION
The table has no general switch. Therefore it must be connected to a socket with 16 A minimum intensity,
fitted with a switch and a magnetothermic differentials of at least 3 mm.
OPERATION TO FOLLOW FOR THE WORKING OF THE MACHINE
1) Connect the general switch on the feeding line (A).
2) Put the adjusting thermostat (B) on position "5" (about in the middle of the regulation dial). In this way
the temperature of the working board is about 80°C.
3) Await a few minutes until when the temperature of the working board is reached.
4) To be able to profit by the depression on the board, be sure that the handle (D) is in position (1).
5) Press the pedal (E). The motor of suction will start working. (The motor remains connected until when the
pedal (E) is pressed).
IRONING BOARDS WITH BLOWING ACTION
1) Press the pedal (E1) to start up the suction motor (the motor will remain on for as long as the pedal is
depressed).
2) Press the pedal (E2) to start the blowing motor (the motor will remain on for as long as the pedal is depressed).
ATTENTIONS
1) The maintenance has to be carried out exclusively by specialized staff.
2) Replace periodically the cover cloth of the table to enable a correct suction.
3) The working table has never to be left when the iron is feeded and leant on the cover cloth; in any case the
suction table and the iron have to be switched off and the iron placed on its support.
FITTING SLEEVE BOARDS INTO SHAPED IRONING BOARDS (TAL)
1) Insert the articulation (H) into the elbow fitting (F).
2) Fit the sleeve board (L) into the articulation (H).
FITTING SLEEVE BOARDS INTO RECTANGULAR IRONING BOARDS (TAR)
1) Take off the closing plug.
2) Insert the steam tube (N).
3) Take off the 4 closing screws.
4) Put the support for swiving arm (H) in the 4 bolts of the table.
5) Tighten properly the screws and put the swiving arm (L) in the support (H).
6) Put now the requested shape.
WORKING OF THE SHAPE
1) Plug in the shape' s plug in the socket (G).
2) The shape is connected to the adjusting thermostat (B) which drives the heating element of the board.
When the board reaches the working temperature, also the heating element of the shape is off.
3) To concentrate the total depression on the shape it is sufficient to put the lever (D) in position (2).
OPERATION TO EXECUTE AT THE END OF THE WORK
1)
Disconnect the general switch (A).
del 03-01-2007 - C:\SETTORE STIRO\M350-M350S\MANUALE ISTRUZIONI\M300-M350.doc
Pag. 13 di 24