LUND Revolution Bull Bar Manual De Instalación página 4

Parilla delantera
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Front
(Fig 4) Attach each mounting bracket to the
bull bar with (2) bolt assemblies
(Fig 6) Hold air dam up to bottom of
Brackets. Trace Bracket location onto
inside of air dam. Dashed lines indicate
approximate sections to cut from air dam
Driver Side Installation Pictured
Front
Lund International
800-241-7219 • Visit us at lundinternational.com
© 2018 Lund, Inc. All rights reserved.
Lund
and the Lund
are trademarks of Lund, Inc.
®
®
Page 4 of 4
I-Sheet Number I-20261 Rev.A
(Fig 5)
(2) 12mm x 35mm Hex Bolts
(4) 12mm Flat Washers
(2) 12mm Lock Washers
(2) 12mm Hex Nuts
Do not cut through the
top edge of the air dam
The material that your product is made from can
be recycled. Please also consider recycling the
packaging that your product came in.
REVOLUTION BULL BAR
2019 RAM 1500
08/14/18 (DP)

Publicidad

Tabla de contenido
loading

Tabla de contenido