Drilling Information - Weidmuller Klippon POK EX Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51

Drilling information

The Appendix provides detailed information about the drilling area.
You can either use holes that are drilled through or thread holes directly into
the enclosure.
Metric threads should be used which are in compliance with EN/IEC 60423.
Follow the installation instructions from the manufacturer of the fitting
components.
The enclosure's outer draft angles must always be taken into consideration
when attaching the cable feed-through bushings.
The IP protection level must not be compromised.
Various cable feed-throughs can be installed inside the marked drilling area.
The following table lists more detailed information.
Generally you should have a minimum gap of at least 15 mm
between the individual cable glands (the seated diameters).
You may not install cable glands in the lid.
Processing area
30
Seated diameter
of cable gland
Drill-hole diameter

Publicidad

Tabla de contenido
loading

Tabla de contenido