Safety Information; Warnings And Cautions; Preparation - Jacuzzi Bianco AT1201-DF Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

SAFETY INFORMATION

Please read and understand this entire manual before attempting to assemble, operate or install
the product.

WARNINGS AND CAUTIONS

• Handle with care. Vitreous chinaware has glass-like with sharp edg es if broken. Do not drop,
handle roughly or overtighten bolts.
• Risk of hazardous gases. If new toilet is not installed immediately after removing an old toilet,
temporarily plug floor flange hole with a towel (or cover) to block sewer gases from escaping.
• Observe local plumbing and building codes.

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and diagram . If any part is missing or damaged, do not attempt to
assemble, install or operate the product. Please contact customer service for replacement parts
at 1-800-288-4002, 9 a.m. - 8 p.m. EST, Monday - Friday.
Estimated Assembly Time: 60 minutes
Tools Required for Assembly (not included): Toilet Water Supply Line, Adjustable Wrench, Putty
Knife, Flathead Screwdriver, Hacksaw, Carpenter's Level.
If replacing an existing toilet, follow these general guidelines. (Not all toilets and connections are
the same. Therefore, these guidelines may or may not apply.)
Remove Old Toilet
•Turn off water supply and flush tank completely. Use a towel to dry remaining water from tank and
bowl .
•Disconnect and remove old water supply line.
•Remove tank from bowl by removing old tank-to-bowl hardware.
•Remove bowl from floor by removing bolt caps and floor bolt nuts.
•Remove floor bolts from toilet flange and clean old wax, putty and sealant from base area.
(Temporarily plug floor flange with a towel or cover to block sewer gases from escaping.)
NOTE: MOUNTING SURFACE MUST BE CLEAN AND LEVEL BEFORE NEW TOILET IS
INSTALLED.
5

Publicidad

Tabla de contenido
loading

Tabla de contenido