Jacuzzi Bianco AT1201-DF Manual De Instrucciones página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Install Tank
Install foam gasket (AA) over threaded outlet
on bottom of tank (A) and lower onto bowl (B)
so tapered end of foam gasket (AA) fits evenly
into water inlet opening on bowl (B).
black rubber washer (BB) onto the brass bolts
with round heads (EE). Insert the brass bolts
with round heads (EE) down through the holes
in the bottom (inside) of the tank (A) and through
the bolt holes in the bowl (B) . W i th the tank (A)
parallel t o the wall (standing level and upright),
posi tion large metal washer (CC) and large nut
(DD) on t he brass bolts wi t h round heads ( EE )
and alternately hand tighten.
DO NOT TURN BRASS BOLTS WITH
ROUND HEADS (EE) WITH SCREWDRIVER
FROM INSIDE THE TANK (A). INSTEAD,
TIGHTEN LARGE NUTS (DD) FROM
BELOW, HOLDING BRASS BOLTS WITH
ROUND HEADS (EE) IN PLACE AS
NECESSARY.
Push down on the tank (A) and alternately hand
tighten large nuts (DD) again, keeping tank
level. Using pliers or wrench (not included),
alternately give the large nuts (DD) another 1/2
turn to level tank (A).
TO AVOID CRACKING THE BOWL (B), DO
NOT OVERTIGHTEN LARGE NUTS (DD).
Hardware Used
Brass Bolt
EE
with Round
Head
Black Rubber
BB
Washer
Large Metal
CC
Washer
Large Nut
DD
Foam Gasket
AA
6
Place the
BB
x 2
x 2
x 2
x 2
x 1
9
A
CC
DD
EE
AA
B

Publicidad

Tabla de contenido
loading

Tabla de contenido