Step 7: Handrail Arm Installation
• Attach the Left Handrail Arm (11)onto the Left Swing Tube (3) with two Bolts M8*49 (29), two Cruve
• Washers Ø8* Ø16*1.5 (20),and Cap Nuts M8 (30). Attach the Right Handrail Arm (12) onto the Right
• Swing Tube (4) with two Bolts M8*49 (29), two Curved Washers Ø8* Ø16*1.5 (20),and Cap Nuts
M8 (30).
53