Kohler K-8359 Guia De Instalacion página 8

Ocultar thumbs Ver también para K-8359:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Standoff Rod
Locknut
Spout Base
5. Install the Spout
Remove the plaster guard from the supply tube.
Slide the spout over the supply tube.
Adjust the height by loosening the lock nut and rotating the base
as needed.
Thread the standoff rod out of the mounting base and into the
spout by hand.
Check for proper fit following the diagram above.
Trace the spout base on the rough floor with a pencil. The circle
serves as the floor rough-in guide.
Tighten the lock nut and thread the standoff rod back into the
mounting base.
Remove the spout and standoff rod.
Replace the plaster guards.
1006092-2-B
Water
20-1/2"
(52.1 cm)
3-1/4" (8.3 cm)
8
2-1/4"
(5.7 cm)
Kohler Co.

Publicidad

Tabla de contenido
loading

Tabla de contenido