Approval Number; Fields Of Use - CEMO Z-40.12-227 Manual De Instrucciones

Ocultar thumbs Ver también para Z-40.12-227:
Tabla de contenido

Publicidad

GB
National Technical Approval
No.Z-40.21-227, dated 13 June 2014
GRP containment unit
Certificate of conformity
1
In-house production monitoring
1.1
Incoming inspections of source materials
The fabricator has to prove, based on Inspection Certificates 3.1 acc. to DIN EN 10204
provided by the manufacturer of the source materials or by carrying out tests, that the
resins and reinforcement materials correspond to those specified in Annex 2. For source
materials with a national technical approval, the official conformity mark replaces
Certificate 3.1 according to DIN EN 10204.
1.2
Testing the containment units
a) The dimensional accuracy of each containment unit, including wall thickness, must be
tested in accordance with Annex 1.
b) Every containment unit shall undergo a leak test.
2
Initial test
Before ongoing production begins at the manufacturing plant, a containment unit must
be selected at random from the inspected output, at the discretion of the sampler, and
tested by the approved inspection agency for compliance with this national technical
approval.
The samples for initial testing shall usually be taken and marked by the representative of
the inspection agency during the initial factory inspection. The samples must meet the
provisions of Annex 1, of section 1 of this annex and of section 2.3.1 of the Special
Provisions. The sampler must document the sampling process. The test report must
confirm that the samples meet the provisions of Annex 1, of section 1 of this annex and
of section 2.3.1 of the Special Provisions.
3
Documentation
For documentation, see section 2.4.2 of the Special Provisions
5
DIN EN 10204 (2005-01)
Metallic products - Types of inspection documents.
Z36799.14
2. Transport, installation and
operating instructions
Dear customer,
The GRP collecting trough is a quality product that has
been conceived for practical use down to the last detail
and meets all official requirements for a problem-free use.
Details can be found in the following operating instruc-
tions. Thank you for trusting our product.
Your CEMO GmbH
1.
General information
1.1 Attention should be paid to the following documents
– Approval Z-40.12-227, for GRP collecting trough
– Regulations of the water, industrial and building
laws, hazardous substances law where applicable
– Inspection declaration

1.2 Fields of use

The rectangular, open collecting troughs of glass fibre
reinforced plastic GF-UP can be used as a part of storage
systems with mobile containers.
12
Annex 4
5
1.40.12-34/14
They are designed for the storage of:
– used and new engine and gear oils
– diesel fuel, fuel oil EL
– various acids, alkaline solutions, saline solutions
and chemicals according to the resistance list in
the approval.
2.
Transport
Pay special attention to the following to avoid damages
and maintain the warranty claims:
– do not drop or throw the collecting trough
– do not place on edges or sharp objects
3.
Installation conditions
The installation conditions for the respective media can
be found in the pertinent water, industrial and building law
regulations.
The GRP collecting troughs should be installed on a firm,
level base.
4.
Maintenance
GRP collecting troughs require no special maintenance.
The collecting trough should be checked regularly by the
operator according to its approval.
3. Inspection declaration
Inspection declaration
for GRP collecting trough
of glass fibre reinforced plastic as a storage system for
mobile containers.
Article No.:
211.X

Approval number:

Z-40.12-227
We confirm that the GRP collecting trough complies
with the provisions of the general construction inspec-
tion approval. The construction and leak tests have
been performed.
Quality Assurance

Publicidad

Tabla de contenido
loading

Tabla de contenido