• As a supply air temperature controller:
In the supply air duct downstream from the supply air
−
fan if fan is installed after the last air handling unit,
otherwise
In the supply air duct downstream from the last air
−
handling unit in a distance of 0.5 m
• As a minimum supply air temperature limiter:
In the supply air duct as close as possible to the air dis-
charge into the room
• As a dewpoint controller:
Immediately downstream from the droplet separator of
the air washer
Mounting
Procedure:
1.
First mount the flange. For drilling holes, refer to "Di-
mensions".
2.
Bend flexible sensing element manually (never use a
tool) so that – when mounted – it stretches diagonally
across the air duct .
Note! The flexible sensing element may not touch the
duct wall: The minimum clearance is 50 mm and the
smallest permissible bending radius 10 mm
3.
Fit mounting flange.
4.
Slide controller on mounting flange and snap it on.
Electrical installation
• Ensure that the local regulations for electrical installa-
tions are complied with
• The connecting terminals are located under the flexible
plastic cover
• Make wiring according to the plant documentation. If not
available, use the connection diagrams contained in
these Installation Instructions
• Observe the permissible cable lengths
• Switch on power only when commissioning the controller
Settings
2
3
1
1
LED for test mode / normal operation
2
DIP switch block
3
Setting slider for setpoint increase or decrease
4
Setting potentiometer for the relay Q13–Q14
5
Setting potentiometer for the P-band
5
Temperature setting slider for setpoint or limit value
Siemens Building Technologies
All manuals and user guides at all-guides.com
4
5
6
CE1G3332xx
Operating action:
Where?
What?
DIP switch block,
1
2
switches no. 1 and 2
Heating and cooling in sequence
Two-stage heating
Single-stage cooling
Single-stage heating
Control mode and integral action time:
DIP switch block,
3
4
switches no. 3 and 4
P-mode
PI mode, integral action time = 600 s
(SLOW)
PI mode, integral action time = 120 s
(FAST)
PI mode, integral action time = 180 s
(MEDIUM)
Test mode:
DIP switch block,
5
switch no. 5
Test mode
Normal operation
Outside temperature compensation:
DIP switch block,
6
switch no. 6
HIGH
LOW
Switching contact Q13–Q14:
Potentiometer 4
Potentiometer setting should correspond to the re-
quired switching point of output relay Q13–Q14
P-band Y1 (not adjustable for Y2):
Potentiometer 5
Potentiometer setting should correspond to the re-
quired range of the controller's output signal
Setpoint increase / decrease:
Slider 3
Setpoint or limit value (supply or extract air temp.):
Temperature setting
Adjust after commissioning
slider 6
Indication of operating state
The red LED indicates the controller's operating state:
• LED lit: Mains voltage present
• LED flashes: In test mode
The LED is also visible when the cover is fitted.
Commissioning
When used as a controller
1.
Remove housing cover.
2.
Lift flexible plastic cover so that you can access the
setting elements.
3.
Make the settings:
Operating action (DIP switches 1 and 2)
−
Control mode and (with PI mode) integral action
−
time (DIP switches 3 and 4)
07.01.2008
3/20