9
E1
1
10
B= 1/2 of A
L1
C1
M1
4
C1
C1
Reinstall the dam strip (C1) and dam strip support (L1).
Use drill to start #8x 30mm FH screw (E1) into anchor.
Next, use a screwdriver to hand tighten until secure.
Install screw cover (M1) into screw hole. A dot of silicone
can be applied over the screw head to secure.
Vuelva a instalar la barrera (C1) y el apoyo de la barrera
(L1).
Utilice la broca para abrir camino al tornillo n.° 8x 30 mm
FH (E1) hacia el anclaje.
Luego, utilice un destornillador para apretarlos a mano
y asegurarlos completamente.
Instale la tapa de tornillo (M1) en el orificio de tornillo.
Puede aplicarse un punto de silicona sobre la cabeza
del tornillo para asegurarla.
Center Guide Base Bracket Installation
Using measurement "A" from step 1, divide by 2 for
measurement "B".
Measurement "A"
Using a pencil or other marking tool (such as painters
tape), mark distance "B" on the center of the installed damp
strip (C1).
For any questions regarding this step please contact the
Delta Shower Doors Customer Care Team at
1-800-964-4850.
Instalación del soporte de la base de la guía
central
Con la medición "A" del paso 1, divida entre 2 para obtener
la medición "B".
Medición "A"
Con un lápiz u otra herramienta para marcar (como cinta
de pintores), marque la distancia "B" en el centro de la
barrera (C1) instalada.
Si tiene alguna pregunta sobre este paso, póngase en
contacto con el equipo de atención al cliente de Delta
Shower Doors al 1-800-964-4850.
14
÷ 2
f
= ________
measurement "B"
÷ 2
f
= ________
medición "B"