Replacing The Fuses - AD Instruments True RMS AD9929 Manual De Usuario

Multímetro industrial
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

_______________________________________________________________________________

REPLACING THE FUSES

WARNING: To avoid electric shock, disconnect the test leads from any source of voltage before removing the
meter cover.
1. Disconnect the test leads from the meter.
2. Remove the protective rubber holster.
3. Remove the battery cover (two "B" screws) and the battery.
4. Remove the six "A" screws securing the rear cover.
5. Gently remove the old fuse and install the new fuse into the holder.
6.
Always use a fuse of the proper size and value (0.5A/1000V fast blow for the 400mA range [SIBA 70-172-
40], 10A/1000V fast blow for the 20A range [SIBA 50-199-06]).
7. Replace and secure the rear cover, battery and battery cover.
WARNING: To avoid electric shock, do not operate your meter until the fuse cover is in place and fastened
securely.
©Copyright Abacanto Digital SA.
Manual de usuario AD9929
AD Instruments
47

Publicidad

Tabla de contenido
loading

Productos relacionados para AD Instruments True RMS AD9929

Tabla de contenido