KOBE CH-77 Serie Instrucciones De Instalación Y Manual De Operación página 9

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1.
Puncture the knockout holes on the hood as shown in Figure 4.
2.
Unscrew the six screws on the bottom casing. Remove the bottom casing or remove the
baffle filters and spacers. If necessary, arrange the electrical wires to run through the 1"
diameter hole on the top or the rear of the hood. Refer to Figure 5.
3.
Using references on Table 1 and measurements on page 21 center the hood in place
beneath the cabinet and flush with the front of the cabinet.
4.
Draw electrical wires through cabinet access opening.
5.
Place screw (not provided) into the exact center of each knockout hole. Make sure all
screws are in place before tightening screws. CAUTION: MAKE SURE THE HOOD IS
SECURE BEFORE RELEASING.
Ductwork Installation
6.
Use aluminum or steel pipe to connect the plastic exhaust on the hood to the ductwork
above. Use duct tape to make all joints secure and air tight.
7.
Continued on page 16.
All manuals and user guides at all-guides.com
Figure 4
7
1" Diameter
Hole
Figure 5

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Ch7730sqbCh7736sqbCh7742sqbCh7748sqb

Tabla de contenido