Equipment Reception; General Description - Zonair3D AIR PRO 2000 Guia De Instalacion

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Thank you for choosing Zonair3D
Please take a few minutes to read this manual carefully before using your AIR PRO 2000-
3000.

EQUIPMENT RECEPTION

On receiving the equipment, unpack the unit and check it is in correct condition.
Inspect it and check that there are no parts missing and that it has no knocks or
blows.
The equipment is supplied with:
- A box containing 10 attachment brackets or supports, which are sent separately
to be fitted on site to the frame of the machine. It includes 8 M6 Allen screws to
secure the equipment to the required surface.
- An individual absolute filter test certificate along with this start-up guide
Open the inspection panel to check that nothing has moved during transport,
making sure the pre-filter, the GRSystem and the absolute filter are correctly
in place and secure. The inspection panel can be opened by loosening the 8 M6
Phillips screws (4 on each side). These must be tightened again correctly to ensure
the unit remains sealed.

GENERAL DESCRIPTION

PRODUCT
FLOW
RANGE
(m
3
2000
AIR PRO 2000
3000
AIR PRO 3000
The equipment is supplied fully factory wired and programmed.
It includes the following different sections: G4 pre-filter, GRSystem
F7 filter and H14 absolute filter.
8
AIR PRO 2000-3000
products.
TM
MEASUREMENTS
/h)
H X W X L (mm)
414 x 1174 x 1504
414 x 1174 x 1504
POWER
ELECTRICAL
(KW)
POWER SUPPLY
1
1F/230 V, 50-60
1,5
1F/230 V, 50-60
WEIGHT
AVAILAB.
(Kg)
PRESS.
(Pa)
175
261
242
180
gas filter, fan,
TM

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Air pro 3000

Tabla de contenido