Descargar Imprimir esta página

Preparation And Use - Numatic Nusteam PRO 6 Manual De Uso Y Mantenimento

Publicidad

Idiomas disponibles

Idiomas disponibles

English
Easy steam
5

- PREPARATION AND USE

MAIN CONTROLS AND PARTS
Fig. 2
1 – Main switch.
2 – Pressure gauge.
3 - Steam pressure indicator
4 - No water indicator
5 - Water supply pilot light.
6 - Boiler ignition switch
7 - Water delivery commutator
8 - Hose socket
9 - Water tank cap
Fig. 3
PREPARATION
Handle installation.
insert the handle on the suppor-
ting structure of the machine
(fi g. 3)
Secure the handle to the struc-
Fig. 4
ture using the two fi xture points
(1 e 2). Correctly position the
screws with the relative panel
in the hollow inside the handle
and tighten the knob (Fig. 4)
31

Publicidad

loading