LF Project Source F512C021CP Instrucciones De Montaje página 7

Tabla de contenido

Publicidad

ASSEMBLY INSTRUCTIONS
10. Insert lift rod (D) into faucet (A) and, from
below, attach to lift rod strap (G). Tighten
thumbscrew (H) on lift rod strap (G).
11. Adjust ball rod (N) to the down position.
Attach ball rod (N) to lift rod strap (G) with
spring clip (L).
12. Loosen thumbscrew (H) on lift rod strap
(G). Adjust lift rod (D) to down position.
Tighten thumbscrew (H) on lift rod
strap (G).
10
D
A
1
11
12
7
D
2
G
G
L
N
2
D
H
H
H

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0749790

Tabla de contenido