4.6.1 Activating the rechargeable battery
JLA-e 5/12 G Hub
1
Laden/
ON
Charge
OFF
4
5
Item number
1
2
3
4
5
- 46 -
Electrically driven trolleys JLA-e 5/12 G with stroke and JLA-e 15/30 G with stroke
JLA-e 15/30 G Hub
2
0
_
1
+
B AT T E RY
Description
Main switch
State of charge indicator
(SOC indicator)
Battery status lamp
Charging socket
Status lamp, charging
process
1
_ +
0
E R
Y
T T
B A
1
5
4
> Switch on the main switch (1).
> JLA-e 15/30 G with stroke: The battery status lamp
(3) briefly lights up. A "beep" will sound.
> The SOC indicator (2) lights up.
© JUNG Hebe- und Transporttechnik GmbH
2
Battery
Level
3