Sealant
6
Sellante
Mastic
D
Push the hot valve body (N) on the left side
and the cold valve body (G) on the right side
up from below the sink. Use one had to hold
one valve body and the other hand to perform
the action in the next step.
Push the hot valve body (N) on the left side
and the cold valve body (G) on the right side
up from below the sink. Use one had to hold
one valve body and the other hand to perform
the action in the next step.
Push the hot valve body (N) on the left side
and the cold valve body (G) on the right side
up from below the sink. Use one had to hold
one valve body and the other hand to perform
the action in the next step.
10
L
K
Apply a generous bead of plumbers putty or
other sealant to underside of the upper
mounting washers (D). A putty groove is
provided for this purpose.
Apply a generous bead of plumbers putty or
other sealant to underside of the upper
mounting washers (D). A putty groove is
D
provided for this purpose.
Apply a generous bead of plumbers putty or
other sealant to underside of the upper
mounting washers (D). A putty groove is
provided for this purpose.
8
C
Slide clip (C) into the groove on each valve body.
Slide clip (C) into the groove on each valve body.
Slide clip (C) into the groove on each valve body.
Attach the hose (K) to the bottom of the
spout base (L). After the (K) has been pushed
up as far as possible, push the white clip in
until a "click" is heard. Tug downward to
test engagement.
Attach the hose (K) to the bottom of the
spout base (L). After the (K) has been pushed
up as far as possible, push the white clip in
until a "click" is heard. Tug downward to
test engagement.
Attach the hose (K) to the bottom of the
spout base (L). After the (K) has been pushed
up as far as possible, push the white clip in
until a "click" is heard. Tug downward to
test engagement.
7
Rojo = Caliente
Rouge = Chaud
N
Hold each valve body with one
9
wrench and tighten the lower
mounting nut using a 2nd wrench.
Hold each valve body with one
wrench and tighten the lower
mounting nut using a 2nd wrench.
C
Hold each valve body with one
wrench and tighten the lower
mounting nut using a 2nd wrench.
N
11
L
N
K
Follow the same procedure as in step 10 to attach
the exible supply hose (K) to the valve bodies (N&G).
Listen for the "click" and tug to test engagement.
Follow the same procedure as in step 10 to attach
the exible supply hose (K) to the valve bodies (N&G).
Listen for the "click" and tug to test engagement.
Follow the same procedure as in step 10 to attach
the exible supply hose (K) to the valve bodies (N&G).
Listen for the "click" and tug to test engagement.
G
Red = Hot
Blue = Cold
Azule = Frio
Bleu = Froid
F
G
G