Descargar Imprimir esta página

Kohler K-300 Instrucciones De Instalación página 6

Válvula flujo alto de 1/2 de bañera montada sobre la bañera/cubierta
Ocultar thumbs Ver también para K-300:

Publicidad

Idiomas disponibles

Idiomas disponibles

3. INSTALLATION CHECKOUT (ALL INSTALLATIONS)
Thread 3/8" pipe plug into top of spout supply tube.
Ensure valves are closed (cold fully counterclockwise, hot
fully clockwise).
Turn on main water supply and check complete
installation for leaks with valves closed and open. Repair
as required.
Close both valves. Turn off main water supply.
WARNING: Risk of personal injury. Lines will be
pressurized. Do not lean over pipe plug when turning
or removing the plug.
Wrap a towel around the pipe plug to prevent water spray.
Water will purge from the supply tube when you remove
the plug.
Carefully back out pipe plug to relieve pressure.
Thread pipe plug into spout supply tube. Leave pipe plug
installed until spout and handle installation.
Install cardboard plaster guards over both valves and
spout supply tube. Leave in place until spout and handle
installation.
4. INSTALL TILE (IF APPLICABLE)
Verify that there will be a 1" (2.5cm) to 1-1/2" (3.8cm)
distance from the top of the sleeve to the top of the tile. If
not, do not install tile due to improper valve installation.
If proper clearance exists, install tile up to plaster guards
on valves and spout supply tube.
A
1013511-2-
3/8" Pipe Plug
CLOSE
HOT
Sleeve
Threaded
Tile
Collar
Rough
Deck
6
CLOSE
COLD
Fig. #11
1" (2.5cm) MIN.
Spout
1-1/2" (3.8cm)
Supply
Tube
MAX.
Fig. #12
Kohler Co., Kohler, WI U.S.A.

Publicidad

loading

Este manual también es adecuado para:

K-p300K-300-krK-p300-krK-300mK-p300m