Charger Operation - sunjoe 4V-PS10-CT Manual De Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Unpacking
Carton Contents
• Cordless pole saw
• 10 in. (25.4 cm) guide bar
• 10 in. (25.4 cm) cutting chain
• Bar sheath
• Manual with registration card
1. Carefully remove the cordless pole chain saw and check
to see that all of the above items are supplied.
2. Inspect the product carefully to make sure no breakage or
damage occurred during shipping. If you find damaged or
missing parts, DO NOT return the unit to the store. Please
call the Snow Joe
+ Sun Joe
®
1-866-SNOWJOE (1-866-766-9563).
NOTE: Do not discard the shipping carton and packaging
material until you are ready to use your new cordless pole
chain saw. The packaging is made of recyclable materials.
Properly dispose of these materials in accordance with
local regulations.
IMPORTANT! The equipment and packaging material are
not toys. Do not let children play with plastic bags, foils,
or small parts. These items can be swallowed and pose a
suffocation risk!
Battery Pack Operation
The equipment is powered by a lithium-ion battery. The battery
pack is completely sealed and maintenance free.
TOOL ONLY
BATTERY + CHARGER SOLD SEPARATELY
In order to operate this cordless pole saw you will need
a iON+ 24V System battery and charger. See page 20 for
battery and charger options and specifications, or for more
information visit sunjoe.com.
Battery Charge Level Indicator
The battery pack is equipped with a push button for checking
the charge level. Simply press the push button to read off the
battery charge level from the LEDs of the battery indicator:
• All 3 level monitoring LEDs are lit: Battery charge level
is high.
• 2 level monitoring LEDs are lit: Battery charge level is
decreasing. Stop work as soon as possible.
• 1 level monitoring LED is lit: Battery is flat. Stop work
IMMEDIATELY and charge the battery. Otherwise the
battery's service life will be greatly shortened.
customer service center at
®
Lights
Light Indicators
Charge level button
The battery is at 30% capacity
and requires charging
The battery is at 60% capacity
and requires charging soon
The battery is at full capacity
NOTE: If the charge level button does not appear to be
working, insert the charger and charge as needed.
NOTE: Immediately after using the battery pack, the charge
level button may display a lower charge than it will if checked
a few minutes later. The battery cells "recover" some of their
charge after resting.

Charger Operation

m
WARNING!
Charge only Sun Joe
battery pack with its compatible Sun Joe
charger. Other types of batteries may cause personal injury
and damage.
To reduce the risk of electric shock, do not allow water to flow
into the charger's AC/DC plug.
TOOL ONLY
BATTERY + CHARGER SOLD SEPARATELY
In order to operate this cordless pole saw you will need
a iON+ 24V System battery and charger. See page 20 for
battery and charger options and specifications, or for more
information visit sunjoe.com.
When to Charge the iON+ 24V Lithium-
iON Battery
NOTE: The iON+ 24V lithium-iON battery pack does not
develop a "memory" when charged after only a partial
discharge. Therefore, it is not necessary to run down the
battery pack before inserting the charger plug.
• Use the battery indicator lights to determine when to charge
your iON+ 24V lithium-iON battery pack.
• You can "top-off" your battery pack's charge before starting
a big job or after a long day of use.
9
24V lithium-ion
®
24V lithium-ion
®

Publicidad

Tabla de contenido
loading

Productos relacionados para sunjoe 4V-PS10-CT

Tabla de contenido